Details and guidance for fabrication and installation of signals, illumination and ITS.

Use the following index links to go directly to that detail:

This plan provides the necessary details for installing a pedestrian push button post with one or two H-frame type pushbuttons.

Note: IS-1 is provided for modification of existing H-frame type pushbuttons where allowed, including placement of a new Type PPB signal standard.  See the Standard Plans for APS pushbutton installation information, and Detail IS-2 for APS pushbutton extensions.

View the Pedestrian Push Button Post and Foundation plan sheet (PDF 290KB)

This plan provides the necessary details for installing an APS PPB extension.

An APS PPB extension is only used where APS PPB cannot be made accessible by other means. Generally, this will be on existing traffic signal systems where foundations limit the ability to bring sidewalk closer to the APS PPB or locations where the APS needs to be extended over guardrail. New construction should be designed to avoid the need for APS PPB extensions.

View the Accessible Pedestrian Signal (APS) Pedestrian Pushbutton (PPB) Extension plan sheet (PDF 118KB)

Download the Accessible Pedestrian Signal (APS) Pedestrian Pushbutton (PPB) Extension WinZip file (ZIP 368KB) (WinZip file contains the following file formats: .dgn, .dwg, and .doc files)

This drawing shows the necessary details for placing Conduit Sleeves around the Conduit Deflection Joints installed in Retaining Wall Traffic Barriers.

Conduit Deflection Joint with Sleeve

This drawing is intended to supplement Standard Plans J-60.11 and J-60.12, Bridge Traffic Barrier plans, and retaining wall plans that require a conduit deflection joint. It should be included as a detail in any contract with these features.

Conduit Deflection Joints protect the conduit and wires where they pass through the barrier/retaining wall expansion joint that is coincident with the footing construction joint. Use of Conduit Deflection Fittings at these junctures diminishes the threats posed by structural movement and the weather.

The sleeve is applied to accommodate the differential movement of the concrete during the pour, and to maximize protection of the fitting during construction. It consists of a casing of polystyrene foam wrapped in duct tape. The foam has a relatively high friction resistant surface that provides sufficient durability. This is enhanced by the tape which is intended to weatherproof the sleeve while exposed, and to resist concrete intrusion during the pour.

View the Conduit Sleeve Detail plan sheet (PDF 148KB)

Download the Conduit Sleeve Detail WinZip file (ZIP 134KB) (WinZip file contains the following file formats: .dgn, .dwg, and .doc files)

This plan depicts the minimum dimensional requirements for an approved shipping pallet for use transporting electrical equipment for projects.

Securing the cabinet to the pallet will provide a safe and easily maneuverable load when proper equipment is used for handling. Accidental tipping of the unit is greatly decreased when the cabinet is secured to the pallet.

View the Cabinet Shipping Pallet plan sheet (PDF 43KB)

Download the Cabinet Shipping Pallet WinZip file (ZIP 66KB) (WinZip file contains the following file formats: .dgn, .dwg, and .doc files)

This drawing is intended to support the following Standard Plans:

The drawings use the ADA (American Disabilities Act) guidelines as outlined in the MUTCD.

View the Accessible Pedestrian Pushbutton Post Placement plan sheet (PDF 46KB)

Download the Accessible Pedestrian Pushbutton Post Placement WinZip file (ZIP 191KB) (WinZip file contains the following file formats: .dgn, .dwg, and .doc files)

Note: Include the following plan sheet(s) (as applicable) as part of the Contract Plans for any WSDOT Contract requiring the installation of any of the following Signal Standard Types:

Conventional Signal Standard Design (IS-13) This plan provides the necessary details for installing conventional Signal Standards (Type PPB, PS, I, II, and III).

View Conventional Signal Standard Design plan sheet (PDF 53KB) Type II or III Signal Standards with double arms at angles other than 90 degrees require design support from the Bridge and Structures Office.

Ramp Meter Signal Standard Design (IS-13A) This plan provides the necessary details for installing Signal Standards used in Ramp Meter Systems (Type RM, FB, and II).

View Ramp Meter Signal Standard Design plan sheet (PDF 44KB)

Rapid Flashing Beacon (RFB) System Standard Design (IS-13B) This plan provides the necessary details for installing Signal Standards used in RFB Systems (Type FB and II).

View Rapid Flashing Beacon (RFB) System Standard Design plan sheet (PDF 51KB)

Foundation Design Per the "Soil Investigation in the Signal Design Process" memorandum, Region electrical design groups need to contact the Region Materials Engineer (RME) and request soil condition data and foundation recommendations. The RME will assess the site's soils and topography for the proposed Signal Standard location. View Foundation Design Memorandum (PDF 88KB).

Based on the RME's assessment, there are two options:

1. If the soil conditions and slopes are such that a standard foundation design can be used, the RME will recommend to the Region electrical design group that the foundation depth be designed using the criteria contained within the applicable Standard Plan. Foundation depths shall be obtained from Standard Plan J-26.10 using the criteria contained therein.

View Standard Plan J-26.10 (PDF 64KB)

Standard Plan J-26.10 Foundation Construction Methods:

Alternate 2 (backfill material not shown)

2. If soil conditions or slopes will not allow for the use of a standard foundation design (such as soils that are too soft, loose or solid rock is encountered, or the slopes are too steep), the RME will recommend using a special foundation design. At this point, the RME may elect to provide the foundation design recommendations directly to the Bridge and Structures Office or request that the HQ Geotechnical Division provide the recommendations to the Bridge and Structures Office. In either case, the Bridge and Structures Office will be responsible for the development of the special foundation design.

In no case should an individual from the Region electrical design group select a standard foundation for use without the recommendation and concurrence of the RME.

Per the above memorandum, Region electrical design groups are directed to request a soils analysis, in memorandum format, from the RME. Please note the highlights, representing the specific information to be included for each project, in the provided template. View Soils Analysis Request Memo (PDF 20KB)

Plan Sheet IS-13 View IS-13 plan sheet (PDF 266KB)

Download the IS-13 WinZip File (ZIP 1.1MB) (WinZip file contains the following file formats: .dgn, .dwg, and .doc files)

Plan Sheet IS-13A View IS-13A plan sheet (PDF 266KB)

Download the IS-13A WinZip File (ZIP 1.1MB) (WinZip file contains the following file formats: .dgn, .dwg, and .doc files)

Plan Sheet IS-13B View IS-13B plan sheet (PDF 266KB)

Download the IS-13B WinZip File (ZIP 1.1MB) (WinZip file contains the following file formats: .dgn, .dwg, and .doc files)

Note: Include this plan sheet as part of the Contract Plans for any WSDOT Contract requiring the installation of a Signal Bridge Standard.

Signal Bridge Design This plan provides the necessary details to install a Signal Bridge.

Camera and associated hand hole on signal bridge

Foundation Design Per the "Soil Investigation in the Signal Design Process" memorandum, region electrical design groups need to contact the Region Materials Engineer (RME) and request foundation recommendations. The RME will assess the site's soils and topography for the proposed Signal Bridge Standard location. View the Foundation Design Memorandum (PDF 88KB).

The RME may elect to provide the foundation design recommendations directly to the Bridge and Structures Office or request that the HQ Geotechnical Office provide the recommendations. In either case, the Bridge and Structures Office or the Engineer of Record will be responsible for the development of the special foundation design.

In no case should an individual from a region electrical design group select a standard foundation for use without the recommendation and concurrence of the RME.

Per the above memorandum, region electrical design groups are directed to request a soils analysis, in memorandum format, from the RME. Please note the highlights, which represent the specific information to be included for each project, in the provided template. View Soils Analysis Request Memo (PDF 30KB)

View Signal Bridge Standard Details plan sheet (PDF 85KB)

Download the Signal Bridge Standard Details WinZip file (ZIP 90KB) (WinZip file contains the following file formats: .dgn, .dwg, and .doc files)

Note: Include this schedule detail as part of the Contract Plans for any WSDOT Contract requiring the installation of a High Mast Luminaire.

Designers: Reference- Include (IS-16a) High Mast Luminaire Maintenance Pad in the contract plans.

View High Mast Luminaires plan sheet (PDF 17KB)

Download the High Mast Luminaires WinZip file (ZIP 90KB) (WinZip file contains the following file formats: .dgn, .dwg, and .doc files)

The design of a project lighting system using High Mast Luminaires requires a collaborative effort to determine; where to place the luminaires, the site specific conditions, and the structural analysis needed to provide an adequate foundation for the luminaires. The designer will capture the project design criteria in the schedule for use on the project and for ease of use by future designers.

This Luminaire Schedule is to be included in the development of any Contract Plan that requires the installation of a High Mast Luminaire.

View Luminaire Schedule plan sheet (PDF 17KB)

Download the Luminaire Schedule WinZip file (ZIP 90KB) (WinZip file contains the following file formats: .dgn, .dwg, and .doc files)

High Mast Luminaire Maintenance Pad on slopes level to 10H : 1V

High Mast Luminaire Maintenance Pad on slopes steeper than 10H : 1V

Foundation Design Per the "Soil Investigation in the Signal Design Process" memorandum, region electrical design groups need to contact the Region Materials Engineer (RME) and request foundation recommendations. The RME will assess the site's soils and topography for the proposed High Mast Luminaire location. View the foundation design memorandum (PDF 88KB).

The RME may elect to provide the foundation design recommendations directly to the Bridge and Structures Office or request that the HQ Geotechnical Office provide the recommendations. In either case, the Bridge and Structures Office or the Engineer of Record will be responsible for the development of the special foundation design.

In no case should an individual from a region electrical design group select a standard foundation for use without the recommendation and concurrence of the RME.

Per the above memorandum, region electrical design groups are directed to request a soils analysis, in memorandum format, from the RME. Please note the highlights, which represent the specific information to be included for each project, in the provided template. View Soils Analysis Request Memo (PDF 51KB)

This plan describes how to repair an existing hole in a traffic standard. There are different methods of repair and they are dependent upon on the size of the existing hole to be repaired.

A welded patch example is shown here. See Plan Sheet for appropriate repair procedure.

View Traffic Standard Hole Repair Procedure plan sheet (PDF 45KB)

Download the Traffic Standard Hole Repair Procedure WinZip file (ZIP 788KB) (WinZip file contains the following file formats: .dgn, .dwg, and .doc files)

Note: Include these details in the Contract Plans for any WSDOT Contract requiring drainage installation for Cable Vault, Pull Box or Small Cable Vault.

Drain Pipe Installation This plan provides the necessary details to install drainage for Small Cable Vault, Pull Box or Cable Vault.

Excavated trench (backfill not shown here)

Drain pipe (backfill not shown here)

The Sump Drain Installation is intended for new installation or when slope is adequate for drainpipe to reach daylight. (Preferred method)

The Side Entrance Retrofit is intended to retrofit an existing Vault or Pull Box when minimum of 2% slope for drainpipe to reach daylight cannot be achieved.

View Cable Vault, Pull Box and Small Cable Vault Drainage Installation Details plan sheet (PDF 104KB)

Download the Cable Vault, Pull Box and Small Cable Vault Drainage Installation Details WinZip file (ZIP 90KB) (WinZip file contains the following file formats: .dgn, .dwg, and .doc files)

These drawings detail the fabrication requirements for Controller Cabinet Riser Adaptor Bases. When Controller Cabinets require additional storage space for conductors, include these details in the Contract Plans.

The P44 Riser Adaptor Base is intended to be used for new installation applications.

The P44 Riser Adaptor Split Base is intended to be used for retrofit applications.

The Region Electrical Design Group is responsible for specifying the installation locations.

View P44 Riser Adaptor Base plan sheet (PDF 61KB)

Download the P44 Riser Adaptor Base WinZip File (ZIP 352KB) (WinZip File contains the following file formats: .dgn, .dwg files)

These drawings detail the fabrication requirements for Controller Cabinet Riser Adaptor Bases. When Controller Cabinets require additional storage space for conductors, include these details in the Contract Plans.

The 332 Riser Adaptor Base is intended to be used for new installation applications.

The 332 Riser Adaptor Split Base is intended to be used for retrofit applications.

The Region Electrical Design Group is responsible for specifying the installation locations.

View 332 Riser Adaptor Base plan sheet (PDF 61KB)

Download the 332 Riser Adaptor Base WinZip File (ZIP 350KB) (WinZip File contains the following file formats: .dgn, .dwg files)

Note: Include the appropriate details from this page as part of the Contract Plans when an RFB system is included in a Contract.

These plans provide placement guidance and construction details for RFB system equipment. Details show both Rectangular Rapid Flashing Beacon (RRFB) and Circular Rapid Flashing Beacon (CRFB) configurations.

Guidance Guidance for the installation of these types of crossings is described in the following policy document Guidance - Uncontrolled Pedestrian Crossings (PDF 269KB)

Construction Details Equipment types and layouts are shown in the updated IS-22, IS-23, and IS-13B details below. General Special Provision 8-20.2(9-29.15).OPT1.GR8 (PDF 13KB) and its header, 8-20.2(9-29.15).GR8 (PDF 32KB), must be included in any contract to ensure that the RFB system supports the required flash patterns and button function requirements. Note that for RFB systems installed on State Highways, WSDOT requires that the beacons be installed above the sign assembly.

IS-22 RFB Details View IS-22 RFB Details plan sheet (PDF 108KB)

Download the IS-22 RFB Details WinZip File (ZIP 413KB) (WinZip File contains the following file formats: .dgn, .dwg files)

IS-23 Pedestrian Crossing Details View IS-23 Pedestrian Crossing Details plan sheet (PDF 266KB)

Download the IS-23 Pedestrian Crossing Details WinZip File (ZIP 1.1MB) (WinZip File contains the following file formats: .dgn, .dwg files)

For Overhead Installations, (IS-23, Sheet 12 of 12), inclusion of Plan Sheet Library (PSL) Detail IS-13B in the Contract Documents is Required.

For questions, please contact one of the following individuals as appropriate: - Guidance: Scott Davis - Sign Placement (IS-23): Rick Mowlds - RFB Poles and Electronics (IS-13B or IS-22): Flint Jackson

Download free Adobe Acrobat Reader Download free evaluation version of WinZip

as recorded by WSDOT and partners in 2020 and 2021.

to our monitoring program in 2021 to help offset climate change impacts.

    Sign up for email or text updates

Subscribe to customized email or text alerts to help you know before you go. Receive current traffic conditions, mountain pass reports, construction updates and more.